Accra–Kumasi Expressway: Ghana must not miss the digital infrastructure opportunity
The Accra–Kumasi Expressway is one of Ghana’s most consequential infrastructure investments in recent years. But its significance should not be measured only in kilometres of asphalt, bridges and interchanges.
If approached strategically, it could become something more consequential: ‘a national platform for building Ghana’s capability in the digital delivery and operation of infrastructure’.
This could be an exemplar for a new generation of safer, smarter and better-managed roads in Ghana and, for that matter, Africa.
“The critical decisions that will determine whether this happens are being made now”.
The Government’s 2026 Budget describes a 198.7-kilometre, six-lane Class A expressway incorporating major interchanges, bridges, service facilities and automated tolling. International prequalification for construction has commenced.
The Government has also established a dedicated delivery vehicle and committed significant funding to the project. This is not an ordinary road project. Ghana should resist delivering it as one.
The opportunity could be bigger than only delivering the road
Globally, major infrastructure is increasingly conceived as both a physical and digital asset. Modern digital solutions such as Building Information Modelling (BIM), Geographic Information Systems (GIS), digital twins, artificial intelligence and integrated data environments can transform how infrastructure is designed, constructed, operated and maintained.
For the expressway, BIM and GIS could integrate road geometry, structures, drainage, utilities and environmental information. During construction, programme, cost and site information could be connected through a common data environment, while drones and reality-capture technologies could support progress and quality verification.
The value is not technology for technology’s sake. It is about giving the Government better visibility over what is being designed, what has been constructed, what has changed, what is being paid for and, ultimately, how the asset is performing.
Learning from previous projects in Ghana
Ghana’s infrastructure experience demonstrates why front-end planning matters. The front end of an infrastructure project is the early, pre-construction phase in which project objectives are defined, feasibility is established, and technical, commercial and delivery risks are assessed before major capital commitments are made.
Over the years, performance audits conducted by the Ghana Audit Service have consistently highlighted weaknesses in the front-end planning and development of road infrastructure projects, including the Eastern Corridor Road and several others.
A World Bank review of the earlier Accra–Kumasi Highway PPP proposal identified weaknesses in business case preparation. More recently, the Accra–Tema Motorway expansion attracted parliamentary attention in Ghana, highlighting opportunities to strengthen project initiation processes and the design of delivery models for major infrastructure projects.
The National Cathedral project provides another cautionary example of the importance of front-end definition and certainty. Questions around scope, cost, financing arrangements and the pathway to completion became increasingly prominent as implementation progressed.
Whatever one’s view of the project itself, its experience reinforces the importance of establishing a credible business case, funding strategy, delivery model, governance arrangements and clearly defined requirements before substantial implementation begins.
These are different projects, delivered under different circumstances. Collectively, however, they reinforce a fundamental infrastructure principle:
“Issues that are not resolved early through data-driven decision-making become much harder and more expensive to address once project implementation begins. Digitalisation cannot compensate for weak governance, but good digital information and data can help strengthen it.”
Digitalisation cannot be an afterthought
Ghana should therefore not appoint the main contractors and then ask what digital technologies can be deployed. By then, important decisions on design, specifications, interfaces and budgets may already have constrained the options. Digital delivery and smart-infrastructure consultants should be procured now, at the project front end.
Working alongside engineering, operational and road-safety advisers, they should identify, evaluate and cost the optimum digital solutions for both project delivery and the operation of the completed asset.
For delivery, this could include BIM-GIS integration, common data environments, 4D programme and 5D cost modelling, digital design coordination, reality capture and structured asset information.
Together, these tools can improve delivery monitoring by providing more timely and reliable information on progress, cost, design changes and emerging risks, while strengthening project governance through greater transparency, traceability and accountability in decision-making.
For operations, options should include digital twins, intelligent speed and axle-load monitoring systems, automatic incident detection, traffic and weather monitoring, smart tolling, variable-message sign systems and predictive maintenance.
“However, not every technology will provide sufficient value in Ghana”. That is precisely why an assessment is needed now. The objective should be to identify the optimum solution based on safety, whole-life cost, maintainability, local capability and future adaptability.
Build a smart, intelligent and safer motorway
A new controlled-access motorway provides an opportunity to establish a new benchmark for road safety in Ghana. Imagine a corridor where intelligent cameras detect a stopped vehicle or collision and alert a control centre; speed-monitoring systems identify dangerous behaviour; weigh-in-motion technology identifies overloaded trucks; weather and flood sensors provide early warnings; and variable-message signs communicate hazards to motorists.
The recent rollout of Ghana’s digital traffic enforcement system, TraffiTech-GH, offers a promising example of the potential of digitalisation in the road sector. Within just weeks of implementation, early indications suggest positive changes in driver behaviour and improved compliance with traffic regulations, despite initial implementation challenges and limitations in existing infrastructure.
This demonstrates the important role digital technologies can play in improving how Ghana develops, manages and operates its infrastructure. Building on this potential, digital twins could provide infrastructure operators with dynamic, continuously updated representations of traffic conditions, pavement performance, bridges, drainage systems and incidents, enabling more informed decision-making and proactive asset management.
These are not futuristic concepts but technologies already being deployed within intelligent transport systems internationally.
While some capabilities may be required immediately, others can be introduced progressively. However, the enabling infrastructure, including fibre connectivity, reliable power supply, communications ducts, sensor locations and interoperable data architecture, should be considered and incorporated into project planning and design from the outset. Retrofitting these elements later could prove significantly more complex and costly.
Use the project to help build a Ghanaian digital infrastructure ‘ecosystem’
Perhaps the greatest opportunity is not the technology itself, but the capability Ghana develops while delivering it. The Government should avoid a situation where international contractors deploy sophisticated digital systems and leave Ghana with an excellent road but little enduring capability.
“Digital capability transfer should be a defined project outcome”.
Ghanaian engineers, consultants, contractors and technologists should work within the project’s digital environment. Procurement should require structured training, professional secondments, graduate employment opportunities, local supply chain development and measurable knowledge transfer.
Universities should participate in research and innovation, while Ghanaian SMEs can develop capabilities in BIM, GIS, drone mapping, sensors, data analytics and infrastructure monitoring.
The expressway could therefore help create a domestic digital infrastructure ecosystem serving future roads, railways, energy, water and urban infrastructure.
The Government’s investment would then leave behind two assets: the physical expressway and a stronger Ghanaian digital infrastructure industry.
Put digital requirements into the procurement process
The digital advisers must translate this ambition into information requirements, technical specifications, evaluation criteria and contractual obligations before the principal works are procured. Bidders should demonstrate not simply that they “use technology”, but how their digital approach will improve coordination, cost and programme control, construction assurance, safety, information handover and long-term operation.
Requirements for technologies such as BIM, GIS, interoperability, cybersecurity, data ownership and asset information should be contractual. Frameworks such as ISO 19650 can provide a foundation adapted to Ghana’s circumstances.
The dedicated project organisation should also establish a Digital Delivery and Smart Infrastructure function, initially supported by external expertise but with a deliberate focus on developing Ghanaian capability.
This is how government becomes an “intelligent client” able to define what it needs, interrogate project information, challenge suppliers and ensure that digital information remains useful after construction.
Summary
Ghana can build approximately 200 kilometres of road and end up with just that, “a road”.
Or it can use this investment to transform how the country delivers and manages infrastructure. The Accra–Kumasi Expressway could establish new digital standards, develop Ghanaian expertise, strengthen local technology businesses, and set a new benchmark for safer, more digitalised and data-driven infrastructure.
But these benefits will not happen automatically. While the underlying technologies may appear complex, their implementation is entirely achievable and far from unrealistic. Similar approaches are already being successfully deployed across the infrastructure sector, demonstrating their potential to maximise infrastructure budgets and deliver stronger value for money.
The real challenge is not simply whether the technology exists, but whether the right solutions are selected for Ghana’s context and translated from technical capability into practical delivery. That requires a fundamental shift in mindset.
It requires confidence from government and implementing organisations in the value of digital capability, sustained leadership commitment to long-term benefits realisation, and a focus on maximising value across the entire asset lifecycle.
Crucially, technology alone is not enough. Government must also develop and retain the internal expertise needed to intelligently specify, procure, govern and manage these advanced assets from inception through to delivery and operation.
The tools to transform infrastructure delivery are already within reach. What is now required is decisive leadership to champion this approach, invest in public-sector capability and unlock the full value of infrastructure investment for the public good.
“These capabilities must be conceptualised, evaluated, costed and procured from the outset.”
If Ghana gets these front-end decisions right, the expressway could leave behind not only a road, but also the people, businesses, technologies and institutional capability needed to support the country’s next generation of infrastructure.
“I strongly urge the Government of Ghana to consider these proposals to ensure that the project is delivered in a digitally enabled way and that the intended benefits are fully realised.”
About the author: Professor Abdul-Majeed Mahamadu, MCIOB MRICS, is a Ghanaian expert in infrastructure digitalisation, cost intelligence and construction innovation.
He is a Full Professor at University College London (UCL), based at The Bartlett School of Sustainable Construction. His research and consultancy focus on improving infrastructure delivery, productivity, cost performance and safety through digital technologies, data-driven decision-making and innovative construction methods.
Comments (0)
No comments yet. Be the first to share your opinion!