High demand, buildings over pipelines worsening Tema water crisis – GWL
The Ghana Water Limited (GWL) has attributed persistent water shortages in parts of the Tema Metropolis to rising customer numbers, faults at its treatment plant, and buildings constructed over water pipelines, which are complicating repair works.
The Company disclosed these challenges during a meeting with the Tema Metropolitan Chief Executive, Ebi Bright, who invited its officials to explain the prolonged interruptions in water supply across the metropolis.
In a post on Facebook, the Mayor noted that some communities have gone days without water, while others have endured weeks of shortages, leaving households struggling to secure enough water for drinking, cooking and basic hygiene.
According to her, GWL explained that the growing customer base in its Tema West Region has placed additional pressure on the water supply system, while faults in some pipeline sections and at its treatment plant have compounded the situation, forcing longer interruptions in several communities.
The Company also indicated that ongoing repairs are expected to bring some relief and advised residents to store sufficient water whenever supply becomes available to help them cope during periods of interruption.
She also raised concerns about buildings constructed over water pipelines in some communities, explaining that such structures obstruct access to the pipelines and make it difficult for engineers to undertake repairs when faults occur.
Ebi Bright assured that the Assembly would continue engaging GWL on the progress of the repairs and push for clear and timely updates to enable residents to plan around the interruptions.
Read Also:
GRA uncovers VAT breaches at 14 businesses at Achimota Retail Centre
Comments (0)
No comments yet. Be the first to share your opinion!