Ghana’s mineral wealth: From extraction to local refining. The 2030 ambition
The manganese mine at Nsuta, in Ghana's Western Region, has been shipping ore since 1916. More than a century later, the rock still leaves the country the way it comes out of the ground: raw, in bulk, bound for someone else's furnaces.
President John Mahama wants that to stop. "I say in 2030 there will be no mineral ore leaving Ghana," he said in February. "We are not going to ship manganese ore, bauxite, iron ore out of Ghana raw. You must process all that locally."
It is a popular promise in a country that has long complained about selling cheap and buying dear. But the numbers show how far Ghana has to go. Right now, it refines about a third of the small-scale gold it sells abroad. It refines no manganese and no bauxite at all.
The stakes are highest for gold. Between January and October, Ghana exported $30.4 billion of goods, and $20.9 billion of that was gold, Bank of Ghana data show. But most of it leaves as doré, a rough bar of mixed metals, and is purified to 99.99% in Dubai or Switzerland. The refining fees, the jobs and the know-how stay there.
The government has now put dates and money behind the pledge. In the 2027 budget, presented on Nov. 12, Finance Minister Cassiel Ato Forson set aside $1.5 billion for mineral processing. At least 70% of gold from small-scale miners must be refined in Ghana by December 2027, and all of it by December 2028, when exports of raw small-scale gold will be banned. Half the country's manganese and bauxite is to be processed locally by 2028, and all of it by 2030. The money is meant for a round-the-clock processing zone in the Western Region, a railway from Takoradi to the Nyinahin bauxite fields, a bigger Takoradi port and an inland port at Hamile, near the border with Burkina Faso.
Gold is nearest the finish line. Small-scale miners, who in 2025 produced more of Ghana's gold than the big corporate mines for the first time in over a century, turn out about 2.4 million ounces a year on average, according to the Ghana Chamber of Mines. That's about 75 tonnes. The Ghana Gold Board, the state buyer says roughly 25 tonnes was refined locally between January and Oct. 20. In October alone, the share hit 94.6%.
Ghana already has the refineries. Gold Coast Refinery and Royal Ghana Gold Refinery can together handle more than the small-scale sector produces.
What the country lacks is trust. Gold bars move easily around the world only if they come from a refiner on the London Bullion Market Association's "Good Delivery" list. No Ghanaian refiner is on it. In all of Africa, only South Africa's Rand Refinery is. So when a Ghanaian bar lands in Dubai, where most of the country's small-scale gold is sold, the buyer can test it again, melt it again or knock money off the price. Ghana pays about $13.80 an ounce to refine at home and can end up paying twice.
Buyers also want to know where the gold came from. Illegal mining, known locally as galamsey, has poisoned rivers and torn up farmland, and Ghana currently has no traceability system that tracks small-scale gold from pit to bar. GoldBod is running a pilot covering 600 mines. Then there is smuggling. A refinery can only process the gold that reaches it, and the Chamber of Mines admits there are no official records of how much small-scale gold is mined. It counts what licensed buyers purchase instead.
There is history, too. Gold Coast Refinery opened in 2016 to similar fanfare, then refined almost nothing for eight years after a change of government. Today's flow of gold rests on agreements a future government could tear up.
Manganese and bauxite are a different story. For this sector, Ghana is starting from zero.
Ghana Manganese Company, the country's only manganese miner, has long shipped its ore to its parent company's plants in China, according to the Ministry of Lands and Natural Resources. The ore leaves at about 27% manganese. A $450 million refinery to upgrade it was announced in 2024. It hasn't been built, and nobody has said how much it could process.
Bauxite is the stranger case. Ghana mines it at Awaso, and it also owns an aluminium smelter, the Volta Aluminium Company, or VALCO, in Tema. The two have never been connected. Bauxite must be turned into a white powder called alumina before it can become aluminium, and Ghana has no plant that does that. So all its bauxite is shipped out raw, and VALCO imports all the alumina it uses, according to GIADEC, the state aluminium company. Ghana sells the ingredient and buys it back half-made.
Ghana Bauxite Company has plans for an alumina refinery that would make 500,000 tonnes a year at first and up to 1.5 million later. It is still being studied.
If we line the numbers up the size of the job becomes plain.
For gold, Ghana needs to add about 27 tonnes of refining by the end of 2027 and another 22 tonnes a year later, roughly 1.4 tonnes a week. The gap may be a little smaller than it looks, since the 25-tonne figure covers less than 10 months. For manganese and bauxite, every tonne of capacity still has to be built.
Even that may understate the task. Output is rising faster than the averages suggest. Ghana mined 5.2 million tonnes of manganese and about 2 million tonnes of bauxite in 2025, and plants sized to the past would leave plenty of ore with nowhere to go. The government hasn't published a forecast of how much it expects to mine in 2030, so nobody can say exactly how big the new plants need to be.
Ghana has opened refineries with speeches before and watched them sit idle. This time there is a date, a budget line and a president who keeps repeating the pledge abroad. Whether that's enough will be measured in tonnes after the deadlines.
Comments (0)
No comments yet. Be the first to share your opinion!