{"id":916961,"date":"2022-01-17T08:30:59","date_gmt":"2022-01-17T08:30:59","guid":{"rendered":"https:\/\/www.ghanamma.com\/news\/2022\/01\/17\/activists-dispute-eskoms-assurance-on-the-length-of-koebergs-refuelling-switch-off\/"},"modified":"2022-01-17T08:30:59","modified_gmt":"2022-01-17T08:30:59","slug":"activists-dispute-eskoms-assurance-on-the-length-of-koebergs-refuelling-switch-off","status":"publish","type":"post","link":"https:\/\/www.ghanamma.com\/2022\/01\/17\/activists-dispute-eskoms-assurance-on-the-length-of-koebergs-refuelling-switch-off\/","title":{"rendered":"Activists dispute Eskom\u2019s assurance on the length of Koeberg\u2019s refuelling switch-off"},"content":{"rendered":"<p><\/p>\n<div><img decoding=\"async\" src=\"https:\/\/www.ghanamma.com\/wp-content\/uploads\/2022\/01\/d6b7cda5-f967-58ef-95e8-2eeb5a33fd26&#038;operation=CROP&#038;offset=0x224&#038;resize=2361x1328.jpg\" class=\"ff-og-image-inserted\"><\/div>\n<div><!--sse--><\/p>\n<p>Cape Town &#8211; As Unit 2 of the Koeberg Nuclear Power Station goes offline today for a five-month \u201cregular refuelling and maintenance outage\u201d, anti-nuclear activists have questioned the utility\u2019s sincerity on the length of the outage.<\/p>\n<p>This will be the 25th refuelling outage on Unit 2 since commissioning, and will also see the replacement of the unit\u2019s three steam generators.<\/p>\n<\/div>\n<div>\n<p>During this outage the reactor pressure vessel head, which houses the nuclear fuel while the station is in operation, will also be replaced.<\/p>\n<p>On Saturday, Eskom\u2019s chief nuclear officer Riedewaan Bakardien said: \u201cWhen Koeberg Unit 2 shuts down on Monday, it will have been online, safely generating electricity, for 452 days without any interruption since its last refuelling outage, which was completed in October 2020.&#8221;<\/p>\n<p>However the Koeberg Alert Alliance (KAA) accused Eskom of being disingenuous to call the operation a regular refuelling outage.<\/p>\n<\/div>\n<div class=\"RelatedArticlescss__StyledRelatedArticles-sc-10g88yu-0 ezIKFV\">\n<h2><span>MORE ON THIS<\/span><\/h2>\n<\/div>\n<div>\n<p>\u201cIt is about as accurate as saying your car is going to the mechanic for refuelling, and by the way while busy filling the tank they will also replace the gearbox.<\/p>\n<p>\u201cA refuelling outage takes just over four weeks, and this outage will be either 90 days, 150 days, 155 days or 165 days depending on which Eskom statement one chooses to believe.\u201d<\/p>\n<p>They said previous statements by Eskom said 155 days, and a presentation by Eskom in November 2021 said it would be 165 days (nearly 24 weeks) before the unit could be connected to the grid again.<\/p>\n<\/div>\n<div>\n<p>KAA spokesperson Peter Becker said Eskom was likely to come under pressure from businesses to delay this long-term outage since load shedding would be economically very damaging.<\/p>\n<p>He said the best decision Eskom could make was to delay the refuelling outage, and abandon the refurbishment project so that load shedding could be minimised.<\/p>\n<p>\u201cWith the money they would spend on the life extension refurbishment Eskom could install Gigawatts of solar power, for example,\u201d said Becker.<\/p>\n<\/div>\n<div>\n<p>\u201cNew renewable plants can easily be installed and come online within two years, well before Koeberg reaches the end of its current life in 2024.\u201d<\/p>\n<p>[email&nbsp;protected]<\/p>\n<p><strong id=\"strong-8a8d3b11aea0c020ca841ddab3559bf7\">Cape Argus<\/strong><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cape Town &#8211; As Unit 2 of the Koeberg Nuclear Power Station goes offline today for a five-month \u201cregular refuelling and maintenance outage\u201d, anti-nuclear activists have questioned the utility\u2019s sincerity on the length of the outage. This will be the 25th refuelling outage on Unit 2 since commissioning, and will also see the replacement of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[55],"tags":[],"class_list":["post-916961","post","type-post","status-publish","format-standard","category-headlines"],"_links":{"self":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts\/916961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/comments?post=916961"}],"version-history":[{"count":0,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts\/916961\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/media?parent=916961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/categories?post=916961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/tags?post=916961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}