{"id":1257314,"date":"2022-11-24T14:05:47","date_gmt":"2022-11-24T14:05:47","guid":{"rendered":"https:\/\/www.ghanamma.com\/2022\/11\/24\/finance-ministry-reveals-amount-spent-so-far\/"},"modified":"2022-11-24T14:05:47","modified_gmt":"2022-11-24T14:05:47","slug":"finance-ministry-reveals-amount-spent-so-far","status":"publish","type":"post","link":"https:\/\/www.ghanamma.com\/2022\/11\/24\/finance-ministry-reveals-amount-spent-so-far\/","title":{"rendered":"Finance Ministry reveals amount spent so far"},"content":{"rendered":"<p><\/p>\n<div>\n<div class=\"td-post-featured-image\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" class=\"entry-thumb\" src=\"https:\/\/www.ghanamma.com\/wp-content\/uploads\/2022\/06\/i-need-your-support-to-build-national-cathedral-akufo-addo.jpg\"   alt=\"national cathedral\" title=\"National Cathedral\"\/><figcaption class=\"wp-caption-text\">The design for the National Cathedral<\/figcaption><\/figure>\n<\/div>\n<p>The Finance Ministry has revealed that an amount of GH\u20b5339,003,064.86 has so far been released for the National Cathedral project. <\/p>\n<p>Out of this amount, the Ministry has explained GH\u20b5113,040,654.86 has been paid to the consulting firm for the project, Messers Sir David Adjaye and Associates.<\/p>\n<p>The Ministry added the latest amount spent was GH\u20b525million in March 2022, which was the Government of Ghana\u2019s contribution.<\/p>\n<p><!-- \/22191989129,1002554\/MGL\/mgl_ado_atunwa_300x250 --><\/p>\n<p>These were contained in a document from the Ministry to the parliamentary Adhoc Committee following a request.<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/www.ghanamma.com\/wp-content\/uploads\/2022\/11\/WhatsApp-Image-2022-11-23-at-17.41.33-779x1024.jpeg\" alt=\"\u20b5339m disbursed so far for construction of National Cathedral \u2013 Finance Ministry\" class=\"wp-image-10032214705\" title=\"\u20b5339m disbursed so far for construction of National Cathedral \u2013 Finance Ministry\"\/><\/figure>\n<p>In relation to the payment made to IPPs, the Ministry disclosed a total amount of GH\u20b517.31 billion was paid.<\/p>\n<p><strong>ALSO READ:<\/strong><\/p>\n<p><strong>Ghanaians must be grateful to Akufo-Addo for National Cathedral \u2013 Govt spokesperson<\/strong><\/p>\n<p><strong>Stop using public funds to build National Cathedral \u2013 Mahama to Akufo-Addo<\/strong><\/p>\n<p><strong>Nat\u2019l Cathedral: Ofori-Atta clears air on \u2018withdrawal from contingency fund\u2019<\/strong><\/p>\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.ghanamma.com\/wp-content\/uploads\/2022\/11\/WhatsApp-Image-2022-11-23-at-17.41.33-1-743x1024.jpeg\" alt=\"\u20b5339m disbursed so far for construction of National Cathedral \u2013 Finance Ministry\" class=\"wp-image-10032214706\" width=\"832\" height=\"1150\" title=\"\u20b5339m disbursed so far for construction of National Cathedral \u2013 Finance Ministry\"\/><\/figure>\n<p>The beneficiary IPPs include; Karpower, Cenpower, Amandi Energy, Sunon Asogli, Ameri Energy and AKSA.<\/p>\n<p>Out of this, GH\u20b510.01 billion was also paid as a shortfall in capacity and GH\u20b54.99 billion was used as excess capacity payments while the remaining GH\u20b57.31 billion was used for payments to fuel suppliers for the period mentioned.<\/p>\n<p>            <!--  [embed]https:\/\/www.youtube.com\/watch?v=videoseries[\/embed]<!--\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe>--><\/p>\n<div class=\"youtube-embed\" data-video_id=\"rOkRSVnsP7A\"><iframe loading=\"lazy\" title=\"Promotional Exams: Teachers in Tema region drag GES to court over mass failure (23-11-22)\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/rOkRSVnsP7A?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The design for the National Cathedral The Finance Ministry has revealed that an amount of GH\u20b5339,003,064.86 has so far been released for the National Cathedral project. Out of this amount, the Ministry has explained GH\u20b5113,040,654.86 has been paid to the consulting firm for the project, Messers Sir David Adjaye and Associates. The Ministry added the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1108881,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187],"tags":[],"class_list":["post-1257314","post","type-post","status-publish","format-standard","has-post-thumbnail","category-politics"],"_links":{"self":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts\/1257314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/comments?post=1257314"}],"version-history":[{"count":0,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/posts\/1257314\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/media?parent=1257314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/categories?post=1257314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ghanamma.com\/2022\/wp-json\/wp\/v2\/tags?post=1257314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}